Garage Conversion ADU in Maywood: What It Costs and How Long It Takes
A garage conversion ADU in Maywood typically runs $45,000 to $130,000 and takes 4 to 7 months from permit submission to final inspection. The price hinges on whether we’re keeping the existing slab and walls or correcting decades of shortcuts. Most Maywood garages we open up need structural and wiring work before anything new goes in. For a written line-item quote on your specific garage, call (833) 842-7204. Estimates are free.
How a Garage Conversion ADU Comes Together, Stage by Stage

This isn’t a coat of paint and a mini-split. A garage conversion ADU changes how a structure is classified, which means it has to meet living-space standards from the ground up. Here’s the real sequence we follow, and what you’ll decide along the way.
Days 1 – 3: Demo and discovery
We pull the old door and track, strip drywall where it’s suspect, and open the slab in a couple of spots to check thickness and vapor barrier. This is where surprises surface: knob-and-tube wiring, an undersized header over the old garage opening, or a slab poured too thin to pass inspection. You’ll decide right here whether to keep the existing footprint or adjust it, because every later decision rides on what’s underneath.
Weeks 1 – 3: Structural and framing corrections
The garage door opening gets framed in with a proper header and shear paneling. On a 1940s Maywood garage, that often means sistering studs and adding hold-downs the original build never had. You’ll choose the window and door layout at this stage, since it affects framing before the walls close up.
Weeks 3 – 6: Mechanical, electrical, plumbing rough-in
We run new circuits sized for a kitchenette and full bath, set the drain lines, and rough in the mini-split or heat pump. If the main panel is a 100-amp Zinsco or Federal Pacific era box, that upgrade happens now. You’ll sign off on fixture locations before the walls get closed.
Weeks 6 – 9: Insulation, drywall, and inspection gates
Rough inspections happen in sequence: framing, then MEP, then insulation. Each one gets scheduled and passed before the next trade moves. You’ll decide finishes (floor, paint, tile) during this window so materials land on site when the drywall crew finishes.
Weeks 9 – 16: Finishes, final inspection, and closeout
Flooring, cabinets, countertops, bath tile, paint, and trim. Final inspection follows, then we walk the unit with you line by line. Most of the schedule slip in Maywood comes from permit corrections, not construction, so we build inspection time into the calendar rather than pretending it doesn’t exist.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
The spec decisions on a garage conversion ADU are narrower than a full addition, which is part of the appeal. Still, each one moves money and long-term performance.
- Slab vs. raised floor: A new subfloor over the existing slab costs more but fixes the moisture and cold-floor problem that haunts bare concrete garages. We recommend it in most Maywood conversions.
- Mini-split vs. traditional HVAC: A ductless mini-split fits the low ceilings and small square footage well and costs less to run. Traditional ductwork only makes sense if you’re tying into an existing system.
- Kitchenette scope: A sink, fridge, and two-burner cooktop keeps you in the low range. A full induction range and dishwasher push toward the top.
- Roof and stucco: If the low-pitch roof is original, we upgrade to a proper membrane or a product like Atlas or Tamko asphalt shingle where pitch allows. New stucco on the old shell holds up better than patching UV-broken exterior.
- Windows: Single-hung vinyl keeps cost down. Impact-rated units make sense if you’re upgrading to PGT on other openings at the same time.
What Garage Conversion ADU Costs in Maywood, CA

Plan on $45,000 to $130,000 for a complete, permitted garage conversion ADU in Maywood. Here’s what drives the number up or down.
| Line item | Typical range |
|---|---|
| Structural corrections and framing | $4,000 – $12,000 |
| Electrical service upgrade and new circuits | $3,500 – $9,000 |
| Plumbing rough-in and fixtures | $5,000 – $14,000 |
| Mini-split HVAC | $3,000 – $7,500 |
| Insulation, drywall, and finishes | $12,000 – $30,000 |
| Kitchenette and bath buildout | $8,000 – $22,000 |
| Permits and plan check | $2,500 – $8,000 |
What moves you toward the high end: a full electrical panel replacement, relocating a shared wall, upgrading from a half bath to a full bath, or discovering that the roof needs replacement before sign-off. What keeps it low: keeping the slab, reusing the existing footprint, and a straightforward panel that doesn’t need replacing. A written estimate from Groundwork itemizes each of these lines so there’s no change-order surprise. Our home additions & adu service covers the full project scope when the conversion grows into something bigger.
See the difference
Before
After
Before
After
Before
AfterWhat Maywood Garages Specifically Do to This Job
Maywood is one of the most densely built cities in Los Angeles County, and the housing stock shows it. Most of the homes we work in here are 1940s – 1950s single-story stucco over wood frame, and a large share of garages were converted decades ago without permits. When we open those walls, we routinely find knob-and-tube wiring, undersized framing never engineered for a habitable room, and low-pitch roofs that failed years ago under UV exposure and never got fixed. Lots are often 5,000 square feet or smaller, so staging is tight: mini-excavators, small dumpsters, and occasionally coordinating with neighbors to park a material drop on the street. That reality slows the first week of every conversion in Maywood, and we plan for it. If you’re covering the whole property in one pass, homeowners often pair this with Concrete Driveways & Concrete Work in Maywood or fresh paving for access, and we cover the broader service area through Maywood.
Serving Maywood, CA – Our Local Coverage Area
We serve Maywood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Maywood

Most conversions take 4 to 7 months from permit submission to final inspection. Permit review alone can take 6 to 10 weeks, so the construction itself is roughly 12 to 16 weeks of active work. Call (833) 842-7204 for a timeline specific to your garage.
Yes, always. A garage conversion ADU requires building, electrical, plumbing, and mechanical permits and inspections at each stage. Unpermitted work discovered during a future sale or refinance can force demolition or costly retroactive approvals.
Sometimes. Keeping the slab and tying into existing drain locations saves $5,000 – $15,000, but only if the slab is thick enough and the drains are correctly located. We open the slab in two or three spots during demo to confirm before committing.
The range is $45,000 to $130,000, with most Maywood jobs landing in the $55,000 – $90,000 band. Panel upgrades, full baths, and roof replacement push toward the top. Call (833) 842-7204 for an exact quote on your garage.
Every garage conversion ADU we complete is backed by our 730-Day Done Right Promise. If something isn’t done right, we make it right, in writing, for two years. That covers workmanship across every trade.
Ready to Price Your Garage Conversion ADU in Maywood?
Call (833) 842-7204 to schedule a free on-site estimate. A live person answers, day or night, and we’ll walk your garage, check the slab and panel, and hand you a written line-item quote with no change-order surprises. If the project grows into a larger addition, we’ll scope it together and pull the permits through plan check. The number you see is the number you pay.